Planning

Pre-construction planning for a Sundance lot.

We settle the lot, the drawings, the Wyoming permits and the budget before a board is cut. Six documented phases, run from our Belle Fourche office about an hour away, so a Sundance build starts with its hard answers already on paper.

Wyoming paperwork, settled before the first dig.

We build your house twice. First on paper, then on the lot. Preconstruction is the paper build, and in Sundance it carries more than design. The lot sits in Wyoming. Wyoming runs its own permitting and inspection sequence, and its lien and contractor rules differ from South Dakota’s. We keep both systems straight so the forms never land on your desk.

Crook County permits through Wyoming’s county planning system, and the town of Sundance runs its own review on top of that. Wyoming’s process is generally lighter than what you find in higher-population counties, which can help the schedule. We still plan for review time. A schedule that assumes zero review is a schedule that slips.

Aerial view of a home and shop on open acreage with a long gravel drive
A home and shop on open acreage, reached by a long gravel drive.

Most Sundance owners live in Texas, Colorado or the upper Midwest. For them, preconstruction is also where the remote relationship gets built. Permit milestones and inspection sign-offs appear in Ressio next to the schedule and the budget, so you can follow the Wyoming side of the job without phoning a county office from out of state.

This is where the engineering shows. Multiple members of our team, including our founder, Jason Pedersen, are mechanical engineers, and we read a parcel as a list of inputs: slope, access, water, wastewater, fuel, snow, wind and wildfire. Each one changes the drawings or the budget. Each one gets answered before you sign anything.

The Bear Lodge setting is the reason people build here, and it is also a condition the drawings have to carry. Forest-adjacent lots come with defensible-space requirements, and we treat those as design input from the first schematic. Finding them at inspection is the expensive way to learn about them.

What the lot puts into the scope.

In-town parcels

Usually the most direct scope of the three lot types around Sundance. Site work is simpler, and the town’s own review is part of the permit path.

Bear Lodge mountain lots

Modest slope, pine cover and limited municipal services. Expect clearing, a slope-adjusted foundation and access road work, all priced before design is final.

Ranch acreage

Acreage in the surrounding ranch country needs a well, a septic system and propane. Each gets sited and scoped in preconstruction.

Defensible space

Forest-adjacent lots govern where the house sits and which materials go near grade and at the eaves. We draw that in from the start.

Snow and elevation

Crook County runs from prairie near 3,500 feet to mountain country above 5,500. Roof framing and the access drive get sized for the elevation of your lot.

The drive from Belle Fourche

Sundance is about an hour from our office. Our project manager is on Sundance jobsites weekly during construction, and the plan accounts for that from day one.

If the lot and the budget disagree, we want to find out on paper, where the fix costs an eraser.

The plan, and the house it turns into.

Preconstruction ends with drawings and a budget you can read. These two pages show where that work goes next on a Sundance build.

From the first lot walk to a signed contract.

Six documented phases sit between your first call and a signed cost-plus contract. Here is the Sundance-specific work that happens inside them.

Walk the lot

We walk the parcel with you, or for you when you cannot make the trip, and read what it will support: slope, drainage, access, utilities and where the house wants to face toward the Bear Lodge range and the Tower.

Due diligence

Well, septic and propane on acreage. Clearing, foundations and road access on a mountain lot. Defensible space on anything near the forest. Each item gets a scope and a line in the budget.

Design development

The home is drawn in-house in Chief Architect, with structure and mechanical systems developed alongside the floor plan. You can walk the model in our 3D renderings and VR walkthrough for Sundance homes before anything is ordered.

Wyoming permits

We assemble and submit the permit package through Crook County planning and the Sundance town review, then track every milestone in Ressio where you can see it.

Budget, schedule and contract

You sign a cost-plus contract built on real numbers, with a specification you can read and a schedule in the real order of trades. Our markup is set at signing. Once framing starts, the 3D progress scans in Sundance carry the record forward.

Jason did an amazing job on our garage and shop. He was great at communicating throughout. There were no unexpected costs, he kept right to his quote, with the exception of a couple of add-ons we agreed to in advance.
Wild Blue WanderersOutbuilding client

Planning questions from out-of-state owners.

Does iLevel handle the Wyoming permits for a Sundance build?

Yes. We prepare the submittal, work it through Crook County planning and the Sundance town review, and coordinate the inspection sequence on your behalf. Permit milestones and inspection sign-offs show up in Ressio beside the schedule and budget, so nothing requires you to chase paperwork.

Are Wyoming lien and contractor rules different from South Dakota’s?

They are. Wyoming custom-home work in Crook and Weston Counties is an active part of our portfolio, so keeping both rule sets straight is routine for us. The state line changes the paperwork. The build process and the quality standard stay identical.

What does a Bear Lodge mountain lot add to preconstruction?

Usually clearing for defensible space, a foundation adjusted to the slope and work on the access road. Mountain lots also tend to have limited municipal services, so utilities get worked out early. All of it is scoped in preconstruction, so it lands in the contract instead of arriving later as a change order.

What about an acreage lot in the ranch country around Sundance?

Acreage needs a well, a septic system and propane, and each one gets sited and scoped during preconstruction. Open ground also brings real wind exposure, which feeds into how the house is oriented and framed. None of it is complicated. All of it has to be on paper before the dig.

When does the budget get set?

Before construction starts. Preconstruction ends with a cost-plus contract, a written specification and a schedule in the real order of trades. Our markup is set at signing and does not change during the build, and the budget stays visible line by line in Ressio the whole way.

Do I need to be in Sundance for preconstruction?

No. Most Sundance owners plan their home from out of state, often from Texas, Colorado or the upper Midwest. Drawings, decisions and permit progress move through Ressio and calls with the team. A trip to walk the lot together is worth making if you can, and we plan the rest around the distance.

Can preconstruction start before I own the lot?

Yes, and it often should. A preconstruction review of a parcel you are considering tells you what it will support and what the site work involves before you commit to it. That answer is far easier to act on before closing than after.

Sundance

On the road to Sundance every week.

iLevel works out of Belle Fourche, about an hour from Sundance, and builds across Crook County and the rest of our Wyoming service area. Read how our pre-construction planning works on every build, see finished homes in the gallery, or tell us about your lot.

Sundance custom homes
Start

Walk the lot with us.

Send us the parcel, owned or under consideration, and a sense of the home you want. Jason or someone on the team will set up a preconstruction review and tell you plainly what the lot supports. Call (605) 638-3040 or reach us online.